Alderney Park Conference Centre, Cheshire

169861465_3818169638251763_1309241928993976158_n

Project Description

Contract Duration

The Challenges

Another recent project and a full design, manufacturing and installation service from our experienced team!
Working on behalf of our client, Caddick Construction, our team produced a powdered coated balustrade with iroko hardwood handrails to be displayed at Alderney Park Conference Centre in Cheshire!
A very unique job, our team had great fun designing the balustrade and our client were extremely happy with the end result!

Great Jackson Street, Manchester

vlcsnap-2021-01-10-13h52m13s779

Project Description

Contract Duration

The Challenges

We’re proud to showcase this recent project in Manchester working on the biggest residential development outside London – The Great Jackson Street Development!
The development includes over 6,300 residential apartments alongside restaurants, cafes and local convenience stores.
Meeting deadlines efficiently and working effectively is part of the status quo for Morgan Bros, but our client was especially happy with the progress made by our dedicated team.
We manufactured and installed a bespoke steel staircase and balustrade system, taking notes from the architect to create a 3D design for our client to help them envisage how the end result would look.
We worked on several phases of the development, manufacturing from our local workshop and using our in-house team to install.

Cotton Square, Manchester

28f02c95-f16a-4a61-b307-d6e72c3a2f74

Project Description

Contract Duration

The Challenges

Cotton Square is a development of 23 apartments and townhouses in the heart of Ancoats, a rising and developing area in Manchester. Cotton Square offers a distinctive, design-led home which fuses industrial design with light, airy spaces and roof terraces.

 

Morgan Bros assisted with the development by installing stainless steel balustrades along several staircases in the building. Stainless steel is sleek with both classic and modern touches, complimenting Cotton Square’s bricked-out look.

Wilburn Basin, Manchester

f8930a7d-e736-4606-bcdd-d0599b6b365d

Project Description

Contract Duration

The Challenges

Wilburn Basin is a residential development located on the banks of the Rival Irwell, offering high-quality accommodation that’s a 5-minute stroll away from Manchester City Centre.

 

Morgan Bros worked on behalf of Renaker Build to design and install a footbridge to provide residents with easy access to their accommodation. Stainless steel is very touch and one of the most durable metals on the market. It can endure extreme weather conditions, making it a practical solution for Wilburn Basin all-year-round.

Crown Street, C1 Tower, Manchester

c5e6c344-ad2d-4f64-996d-0955a23dcdbc

Project Description

Contract Duration

The Challenges

Another project collaboration between Morgan Bros and Renaker Build. Taking place in 2020, our team carried out design, manufacture and installation during the Coronavirus pandemic and overcame a variety of obstacles to meet deadlines.

 

C1 Tower in Manchester is a residential block made up of state-of-the-art town houses and plush apartments, forming part of Homes England’s wider strategy to encourage more city centre living. Morgan Bros provided various structurally glazed balustrades, stainless steel handrails and various metalwork items in and around the building to help achieve another handover in a timely manner.

Primrose Gardens Retirement Village, Chorley.

IMG_0877

Project Description

Contract Duration

The Challenges

Primrose Gardens is a modern, new independent living facility for people aged 55+ in Chorley. The building occupies 65 apartments over 3 storeys with a living room, bathroom, bedroom, kitchen and terraced area.

 

Morgan Bros worked on behalf of Eric Wright Group in the crucial development phase of the project, manufacturing and installing steelwork balconies and balustrades with timber handrails across all sides of the building. We also helped manufacture and install a stainless steel balustrade alongside the staircase in reception.

 

The project was undertaken by Eric Wright Group on behalf of Chorley Council and Homes England, forming part of their commitment to build more independent living for the elderly.

Lancashire County Council

IMGM0035

Project Description

Contract Duration – 12 weeks

Completion Date – August 2017

Contract Price – £35,000.00

The Challenges

Lancashire County Council Balustrading and Wall Rails.

Morgan Bros. secured the Contract to manufacture, supply and install a series of 48.3mm Stainless Steel Balustrading complete with powder coated perforated Infill Panels together with a series of Stainless Steel Wall Rails for Lancashire County Council.

Nuffield Health

nuffied-hero

Project Description

Contract Duration – 4 weeks per spa

Completion Date – Ongoing

Contract Price – £30,000.00-£50,000.00 depending on the design

The Challenges

Throughout the last 6 months, Morgan Bros Leisure have undertaken various Stainless Steel Hydro Spa’s for various Nuffield Health sites; Bridgend, Cwmbran, Weston Super Mare, Gloucester and Ilford.

J K Beardsworth – Pinfold

pinfold-hero

Project Description

Contract Duration – 12 weeks

Complete – April 2014

Contract Price – £20,000.00

The Challenges

In October 2013 Morgan Bros were asked to manufacture, supply and install a series of curved Balustrading and Balconies to Pinfold Close in Preston. 

As you can see from the photos this curved specification is very appealing and in touch with the modern era of the 21st Century.

An excellent service carried out to a high standard with a very professional approach

Holdcroft

holdcroft-hero

Project Description

Contract Duration – 10 months

Completion Date – August 2016

Contract Price – £436,000.00

The Challenges

Holdcroft is a retirement village based in Stoke-On Trent. Our client Eric Wright Construction Ltd awarded us the contract to manufacture, supply and install various internal Staircases consisting of MB Series 1 Glass Panel Balustrade.

We also provided 42No. MB Series 5 Structural Glass Balustrades to the foyer area showcasing the ground and first floor.

Finally, we manufactured a series of Juliet Balconies to the exterior of the building providing an outlet for all residents without the need for going downstairs or outside.